Science World reaps benefits of BIM

Moving into the 21st Century – Science World reaps benefits of BIM

Science World reaps benefits of BIM

Science World reaps benefits of BIM : Traditional paper-based drawings may be the status quo for many in the Canadian construction industry but some leading-edge innovators have made the transition into the digital world. Building Information Management (BIM) has already taken root in some sectors and is proving to be an invaluable tool – even in the piling industry.

BIM by design

“I’ve been using BIM for about eight or nine years now,” states Geraldine Rayner, vice-president of Consulting Services, Summit BIM Consulting Ltd. “Unfortunately, the adoption rate across the industry has been patchy at best.”

According to Rayner, there is still a lot of confusion around the concept of BIM. This has led to some hesitation and a slow adoption rate.

“BIM is a process of utilizing digital technology to convey information rather than paper,” she says. “Some in the architectural community are using BIM to produce black and white traditional drawings. A small number of people are using it as a tool to create a digital prototype – that’s where the real value comes into the equation.”

The use of BIM-enabled software allows users to access and manipulate data throughout the various stages of construction – from the design through to facilities management.

“BIM is really about trying to take the digital prototype from the manufacturing side of the industry and applying it to the architectural and owner side,” adds Rayner. “We can do the estimating, the time analysis, scheduling, ordering, etc. – all from a 3D prototype. This allows us to resolve any potential problems before they occur – and well before getting to the actual job site.”

Key benefits

There are many significant advantages inherent in the use of BIM, according to Summit BIM Consulting. These include: collaboration, cost certainty, facility asset management, improved quality, informed decision making, increased productivity, reduced FM cost, reuse of data, reduced changes, reduced risk, and sustainable design analysis/visualization.

At the end of the day, BIM can reduce a project’s overall costs and improve efficiencies along the way.

A report from the Construction Task Force in the United Kingdom, Rethinking Construction, cites recent studies that suggest: up to 30 per cent of construction is rework; labour is used at only 40 to 60 per cent of potential efficiency; accidents can account for three to six per cent of total project costs; and at least 10 per cent of materials are wasted.

“More than 30 per cent of the cost of a project is tied up in inefficiencies, delays and wastage,” states Rayner. “As we learn to use BIM effectively, we can reduce this percentage. But the potential exists to eradicate it completely.”

Rayner describes BIM as a number of different tools. Each segment of the construction industry has its own tool but there is a common “language” that allows everyone to talk to each other. The information is entered once and then used repeatedly throughout the different phases of the project. It may involve a bit more work at the front end but that extra work will reap digital rewards throughout the entire project – even once that project has been handed to the owner in the facilities and operations management phase.

A 2013 McKinsey Global Institute report on infrastructure productivity states that: “A key source of savings in project delivery is investing heavily in early-stage project planning and design. This can reduce costs significantly by preventing changes and delays later on in the process when they become ever more expensive. Bringing together cross-functional teams from the government and contractor sides early in the design process can avoid the alterations that lead to 60 per cent of project delays.”

Summit BIM Consulting typically works with building owners, many of whom have used BIM to great advantage.

“The cost of change orders on a project can be about 10 per cent,” says Rayner. “Owners have to bear that cost. Our clients have all seen a reduction in the number of RFIs and the number of change orders associated with their building projects. They have seen some definite benefits, like having all of the building’s information data go straight through to building, maintenance and operations departments, without needing to be re-entered along the way.”

Other important elements that BIM brings to light – before actual construction – are soft and hard “clashes”. The former refers to having enough space within a certain area of the building to do the required work and the latter is used to identify actual obstructions, such a pipe hitting a duct. All of this becomes readily apparent when working in 3D.

“There’s no doubt that BIM has the potential to improve industry efficiencies,” says Rayner, who adds that the design side of the industry has the skill set to start generating this data and many of the large construction contractors have evolving BIM departments – all of which is very good news.

Piling work proves premise

When consulting structural engineering firm, Bush, Bohlman & Partners, was awarded the $35-million renovation project to Science World in 2011, they didn’t hesitate to make use of Revit Structure within a BIM process to create a 3D digital version of the existing building structure. That foresight has paid huge dividends along the way.

Science World at TELUS World of Science is located in an iconic geodesic dome, which was originally built for Expo ’86 as a temporary structure. The building is close to 30 years old – and still going strong. This is due, in part, to the massive structural engineering work completed in 2011.

“Part of our work in 2011 was to do a seismic assessment and retrofit of the original Expo building podium structure utilizing 3D dynamic analysis,” states Michael Sullivan, CTech, a Structural Technologist/BIM Specialist with Bush, Bohlman & Partners (consulting structural engineers), who adds that the podium and base structure support a 47-metre high geodesic dome and was built partially over water.

“The existing building structure used a complex and congested pile-supported foundation system – with battered piles at major column-support locations. During this expansion project, over 400 – or 98 per cent – of the existing piles were modelled digitally,” he explains.

Extensive new piling work was required on the Science World podium base structure’s existing foundation system. Large steel moment-resisting frames were centred along the radial gridlines on the west side. The frames were anchored by custom-cruciform shape, wide-flange columns. The steel columns were then supported by the new pilecaps keyed into the existing concourse level such that no additional gravity or seismic loads were transferred back to the existing structure.

Bush, Bohlman & Partners used Revit software to determine where the existing piles were located so that workers could cut through the podium’s deck structure to drive the new piles.

“We used the modelling software initially to lay out the locations of the existing piles and to where to cut through the existing deck to drive the new piles,” explains Sullivan, who adds that the new piles were designed to support the new expansion seismic retrofit and relieve the load from the existing structure. “We cast the pile caps directly into the holes cut through the existing deck structure.”

East meets west

The west side of the Podium structure required over 40 new concrete-filled steel piles, of which 30 were battered piles. The former were 508 centimetres in diameter and 15 metres long. The latter were 610 centimetres in diameter and 15 metres long, each with a 55 milimetre diameter Dywidag rock anchor. All of these piles had to be driven from a rig set up on a barge on the False Creek side of the building.

“The battered piles were part of the seismic system upgrade,” explains Sullivan. “Where new columns bear on an existing concrete beam, we spanned new reinforced concrete beams underneath that existing beam and placed pilecaps with battered piles, in groups of three, on either side to transfer the new column loads off of the existing deck support beams.”

The renovation and expansion work on the east side of the podium wasn’t as extensive and didn’t require seismic upgrading to the existing previous expansion completed in 1988. A total of 20 new piles were driven to support the new entry sequence and augment the structure’s existing foundation system.

“The use of Revit software in this project was huge,” states Sullivan. “It facilitated the installation of the piles relative to the dome and to the existing piles. The facility remained open during the work so being able to know the exact locations of where to cut through the deck was invaluable. We used Revit to lay it all out before we started the actual work. Plus, the existing battered piles were slanted and angled in different directions. We used Revit to lay out where each new pile could be located without running into the other piles already there.”

More to come

Although the benefits of using BIM tools were well established – and capitalized upon – during the 2011 renovation project, it looks like it may be a case of where BIM just keeps on giving. Last year, TELUS World of Science again approached Bush, Bohlman & Partners.

“They asked us to conduct an assessment of the dome and piling foundation structure because the facility has long outlasted its initial lifespan as a temporary structure,” states Sullivan. “We’ve been tasked to review all of the existing structure with the goal in mind to make it last many more years.”

In 2014, Bush, Bohlman & Partners completed the condition assessment study of the entire existing building and expansion base structure, which involved going out in a small boat at low tide and doing an extensive visual study of the underneath of the existing base structure. This study revealed the damaging effects of salt water on the existing steel piles and these were categorized within the 3d digital model to create a comprehensive condition assessment report of the base structure. This information will be used to facilitate any future remediation work.

“We categorized the piles according to the severity of their condition and then colour-coded and scheduled them for easy identification,” states Sullivan. “And we can provide all of that detailed information up front so that contractors know exactly where and what needs to be done to provide more accurate bids.”

Fortunately, Bush, Bohlman & Partners already had completed a lot of the preliminary work required in the condition assessment study – thanks to their use of BIM on the 2011 renovation project.

“It does take longer to digitally model a building, especially an existing structure like Science World,” concludes Sullivan. “But we’re certainly pleased that we put the energy in to do it in 2011. Not only did it prove advantageous back then but now, with this new assessment four years later, it will make our work that much easier.” Reference PIC magazine.

Click here to see our services.

Click here to contact us.


RevitDB Link

RevitDB Link

One of the advantages of BIM is the ability to generate large amounts of data from a model with relative ease. In Revit, the data is there but the tools to create reports are lacking. A way around this has been to export Revit models to ODBC and use a database package to generate reports that are attractive and include fields that Revit prevents us from scheduling.

Autodesk has released a new plugin that takes exporting to ODBC to a new level — RevitDBLink. There are two features of this plugin that will revolutionize the way those of us involved in information modeling will work: the bidirectional flow of data, and the ability to store other data and fields within the same database as the model.

I will demonstrate how Revit allows the bidirectional flow of data by exporting a model to a database, changing wall heights in the database, and then sending these changes back to Revit.

I start with a simple Revit model.


Next, I export the model to a MS Access database using the RevitDB Link and selecting a new connection.


My Access database is now populated with a set of tables from Revit. The image below shows the table of walls.


Comparing this table with the data in the Revit model shows that the unconnected heights are all set to 20′.


Within the database I can change these values to new heights.


These changes are loaded back in to the Revit model by selecting ‘edit and import’ from the DBlink plugin dialog box. The changes are then automatically applied to the Revit model.


While Revit allows for the editing of properties within the program itself, it is no match for the power of MS Access in generating reports and performing advanced queries on the models.

When using the built in ‘export to ODBC’ function in Revit, the model would overwrite the existing database. With RevitDB Link, tables associated with the project, but not stored within Revit can be added to the database and will be preserved every time the model is exported. Furthermore, the data will not be loaded in to Revit. This allows us to include information that is relevant to our project but may not need to be in the model, or may not associate with a specific object.

With RevitDB Link we can now add fields to an object and make it invisible to Revit. For example, when we export a model with rooms, the database will show only those fields created in the model. In MS Access, additional fields can be added to the rooms table. When this table is uploaded back to Revit, the new fields are invisible.

Not allowing fields created in Access to be uploaded back in to the model may seem to be a flaw in the bidirectional functionality, but I see it as a brilliant move on the part of the developers.

Revit files can become very large. While we tend to think that file size is directly proportional to the number of objects in a model, the amount of information included in the model also adds to the size. A simple model with additional fields added to objects can be larger than a model with many objects and no information. Do we really need all those fields in Revit?

RevitDB Link allows for almost unlimited access to our models and the information contained within them. If anyone has any ideas that they would like to see implemented, post a comment.

For more information than click here.

For our services click here.


Revit Repeaters

Revit Repeaters

Revit was primarily designed to service BIM (Building Information Modeling). However, do not get stuck thinking that Revit only fits into the BIM space. Revit can be used for a lot of other purposes as well, as can be seen from the images below.

Virusses, micro bacteria, nearly anything can be created in Revit. We just need to find the workaround. The workaround to create these examples was to use the Revit Repeater command.

The first example is of the HIV Virus.

Revit Revit

Example 2 is of a DNA strand.

Revit Revit

The last example was a bit of a challenge: Microbe Bacteria. Creating the bacteria was quite easy, but getting the correct material representation was a tad difficult. Even though it would have been easier in 3ds Max, remember that this blog aims to keep to the default Revit functionality. I believe the result would be good enough to get the message across.

Revit Revit

For more information than contact us.

Click here to see our all services related it.

Can I get a witness? Autodesk to testify in Washington

Can I get a witness? Autodesk to testify in Washington


National leaders look to Autodesk Construction team for support and testimony

In just a few days, our very own Stacy Scopano, Sr. Industry Manager, Building Construction, will meet with members of the National Institute of Building Sciences (or NIBS as those in the know like to say).

The hearing, which is being sponsored by Autodesk and supported by the International Code Council, will provide an opportunity for project stakeholders from the planning, design, construction, operations, ownership, and other segments of the U.S. building industry to speak about the productivity and workforce challenges they face and offer potential solutions.

Building momentum

Autodesk’s involvement at the hearing came at the direct request of Ryan Colker, President Barack Obama’s Construction Advisor. Ryan and Stacy both serve on the Board of Directors for the NIBS Offsite Construction Council. Our participation ties in nicely with our overarching thought leadership efforts. Earlier in the year Stacy and colleagues on the construction marketing team helped to draft a survey that drove the publication of the well-received Economist report “Rethinking productivity across the construction industry: The challenge of change.”

To find out more about the NIBS hearing or read about the Off-site Construction Council visit the NIBS home page, or clickhere to read the Economist report. Reference Can I get a witness? Autodesk to testify in Washington by  Julie Jacobson.

For more information related to it then contact us.

Click here to see our services related to Building Information Modeling.